 |
Dome Oilfield Engineering & Services LLC, UAE |
Fujairah Refinery, UAE |
Consequence and Risk analysis for CDU, VDU, SWS and TGTU units |
|
 |
CGC Converse Technologies Pvt Ltd |
Qatar Petroleum |
HAZID study for replacement of Crude tank V2 at Masaieed Terminal, Qatar |
|
 |
CGC Converse Technologies Pvt Ltd |
Kuwait Oil Company |
Fire and Gas detector location study (mapping study) for HIC affected equipments of five GCs namely, GC – 03, GC – 04, GC – 07, GC – 08 and GC – 21 of KOC. |
|
 |
CGC Converse Technologies Pvt Ltd |
Kuwait Oil Company |
QRA of Burgan Petrol Filling Station in order to assess if the proposed location is safe from the Crude oil and HP gas pipelines and fire station activities nearby. |
|
 |
Green Circle INC |
Indian Oil Corporation Ltd. |
Risk Assessment of IOCL’s Viramgam depot |
|
 |
Bharat Oman Refineries Ltd. (BORL) |
Bharat Oman Refineries Ltd. (BORL) |
ERDMP as per PNGRB regulations 2010 of Crude Oil Terminal (COT) at Vadinar and Vadinar to Bina Pipeline (935km). |
|
 |
Hindustan Petroleum Corporation Ltd |
Hindustan Petroleum Corporation Ltd |
QRA, HAZOP and ERDMP as per PNGRB regulations 2010 of Aviation Filling Station (AFS) at Santacruz, Mumbai |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of LPG Bottling Plant at Usar, Alibaug |
|
|
GAIL India Ltd. |
GAIL India Ltd. |
ERDMP as per PNGRB regulations 2010 of LPG Bottling Plant at Usar, Alibaug |
|
|
Orcus Fire & Risk INC, Texas, USA |
Trafigura terminal, Texas Dock and Rail |
Smoke and Gas Ingress Study of four Crude Tanks in Texas Dock and Rail facility at Corpus Christi, Texas for an adjacent occupied admin building. |
|
|
Orcus Fire & Risk INC, Texas, USA |
Trafigura terminal, Texas Dock and Rail |
Fire Risk Assessment of Six identical Butane bullets (90,000 US gal) in Trafigura terminal, Texas Dock and Rail facility at Corpus Christi, Texas
The study included assessment of risk on an adjacent occupied admin building and a Fire Water Tank. |
|
|
Orcus Fire & Risk INC, Texas, USA |
Trafigura terminal, Texas Dock and Rail |
Fire Risk Assessment of four Crude Tanks in Texas Dock and Rail facility at Corpus Christi, Texas
The study included assessment of risk on an adjacent occupied admin building. |
|
|
Bosch Ltd. |
Bosch Ltd. |
HAZOP study for CNG facility at Manufacturing Plant, Bangalore |
|
|
Bosch Ltd. |
Bosch Ltd. |
HAZOP study of Natural gas Pipeline installed at Bosch’s manufacturing plant, Bangalore. |
|
|
Indian Oil Corporation Ltd (IOCL) |
Indian Oil Corporation Ltd (IOCL) |
ERDMP as per PNGRB regulations 2010 of Indane (LPG) Bottling Plant at Belgum |
|
|
Indian Oil Corporation Ltd (IOCL) |
Indian Oil Corporation Ltd (IOCL) |
ERDMP as per PNGRB regulations 2010 of Indane (LPG) Bottling Plant at Devangonthi |
|
|
Indian Oil Corporation Ltd (IOCL) |
Indian Oil Corporation Ltd (IOCL) |
ERDMP as per PNGRB regulations 2010 of Indane (LPG) Bottling Plant at Mysore |
|
|
Indian Oil Corporation Ltd (IOCL) |
Indian Oil Corporation Ltd (IOCL) |
ERDMP as per PNGRB regulations 2010 of POL depot at Manmad, Maharashra |
|
 |
Bharat petroleum Corporation Limited (BPCL) |
Bharat petroleum Corporation Limited (BPCL) |
Quantitative Risk Assessment (QRA) of Marine Oil Terminal at Jawahar Dweep, Mumbai |
|
|
|
|
Quantitative Risk Assessment (QRA) of all adjacent pipelines in Mahul refinery |
|
|
|
|
Qualitative Risk Assessment of OWS at Mangalia Receipt Terminal, to adhere to OISD standards. |
|
|
|
|
Hazardous Area Classification of POL depot at Miraj, Maharahstra |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Mumbai-Manmad-Bijwasan Multiproduct Pipeline (1389km) |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Mahul refinery, mumbai |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Bina-Kota Multiproduct Pipeline (257km) |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Mahul-Santacruz ATF Pipeline (15km) |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Mahul-Wadilube LOBS Pipeline (12km) |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Kochi Refinery-Kochi AFS Pipeline (34km) |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Mahul-Uran LPG Pipeline (29km). |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Benzine Installation at Sewree, Mumbai |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Khau Creek Installation at Sewree, Mumbai. |
|
|
|
|
Safety audit of four petrol filling pumps located at RTO, Pune – Mumbai Expressway, Khedshivapur and Kelwade |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of LPG Bottling Plant at Uran |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of Liquid Cargo Jetty at Javaharlal Neharu Port Trust (JNPT), Uran |
|
|
|
|
ERDMP as per PNGRB regulations 2010 of A, B and K Installation at Sewree, Mumbai. |
|